0902 678 001
  An Phuc Mechanical Electrical Equipment Co., Ltd specializes in manufacturing Conduit & Fitting, Tray, Trunking, Ladder.
My account
Currency :
Product List

Remove 14,100 MW of coal plants from plan: ministry

Thursday, 28/07/2022 GMT+7

Remove 14,100 MW of coal plants from plan: ministry

 
Electricians fix power cables in southern Bac Lieu Province. Photo by VnExpress/Nguyet Nhi

The Ministry of Industry and Trade wants coal-fired plants with a capacity of 14,120 megawatts scrapped from electricity production plans for Vietnam to achieve net-zero emissions by 2050.

The plants were included in Power Development Plan 7 (for 2011-20) and have not been built due to delays. Now, the ministry does not want them to be part of Power Development Plan 8 (for 2021-30), which is being drafted.

The ministry also wants to reduce the ratio of coal-fired power sources from 25-31 percent in 2030 to around 10 percent in 2045.

No new coal-fired plant should be built after 2030, it said.

It wants to increase output from LNG-fueled and renewable plants to offset the cut in coal use.

It targets having 12,000-15,000 MW of renewables and 14,000 MW of liquefied natural gas plants in PDP 8.

Source: e.vnexpress.net


Written : admin

Search date :

from      to      

Support Online
Sales
anphuc.vn
0902 678 001